# Work Breakdown Structure (Engineering)

**URL:** <https://forum.seatable.com/t/work-breakdown-structure-engineering/7474>\
**Category:** Collaboration & Sharing\
**Created:** [August 6, 2026, 3:52pm UTC](https://forum.seatable.com/t/work-breakdown-structure-engineering/7474 "2026-08-06T15:52:37Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![Rafael](https://forum.seatable.com/user_avatar/forum.seatable.com/rafael/32/5639_2.png) [@Rafael](https://forum.seatable.com/u/Rafael)\
**Post date:** [August 6, 2026, 3:52pm UTC](https://forum.seatable.com/t/work-breakdown-structure-engineering/7474/1 "2026-08-06T15:52:37Z")

</div>

## Engineering Work Breakdown Structrure

On Org Chat

This WBS (Work Breakdown Structure) is the hierarchical project decomposition for a gas processing plant, built in SeaTable as the backbone of a broader EVM/document-control system.

Structure (4 levels, driven by CodWBS):

 ![1000090428](https://forum.seatable.com/uploads/default/original/2X/5/54bd178f9f9e84921b9f560a6040d48a6a37a2ad.jpeg)